5 Easy Facts About Termite Control For Wood Described

Indicators on Termite Control For Wood You Should Know


The soil underneath and around the concrete slab has to be treated together with the termiticide until the concrete slab is poured. The termiticide must be applied after installation of this fill material that was sub-slab. Diluted insecticide is then applied to the fill material. per 10-sq. ft.

Termite Control Free Inspection - An OverviewThe Only Guide for Termite Control Furniture
Per 10 sq. ft. In addition to treatment underneath the slab, foundation elements are treated as stated above. In addition, a barrier has to be set around foundation elements adjacent to slabs. For information regarding vertical treatments, see the TREATMENT OF SOIL ADJACENT TO FOUNDATION ELEMENTS section in this brochure. .

The sub-slab release form is used when concrete slabs are poured without treatment of this dirt to the prevention of subterranean termites during its construction as required under minimum standards for the pre-treatment of constructions. This document informs the property owner of all areas of the property that were not treated for the prevention of subterranean termites during its construction and should only be signed by the home owner. .

One of the most important aspects of performing a prosperous pre-construction termite treatment involves the close working relationship between the PCO and the builder. Several trips are usually necessary in order to execute the different stages of treatment. The different stages and timing of applications are as follows: 1 ). After footing acceptance and before pouring of footings.

Facts About Termite Control Furniture Revealed


Following backfill of foundations in crawl space. 3. After leveling of slab areas. 4. After (or during) backfill and final grading into the exterior. Although four excursions to the property are shown here, a suitable treatment can usually be performed in three trips through careful scheduling. .

Baits/monitoring systems might be used for pre-construction termite control. This system has to be installed following the final level and landscaping is completed. These systems are a recent innovation in termite control. Termiticide baits control termites by eliminating or reducing the size of the colony. They do not make a barrier around the structure, as do the insecticides discussed.

The usage of termiticide baits can significantly reduce or eliminate the need for a conventional liquid insecticide. .

There are two approaches for the use of termiticide baits. One involves the placement of monitoring devices containing untreated wood or other cellulose material in the soil around the structure to be shielded. When termites are found in the monitoring device, the untreated cellulose substance is replaced with a treated material, known as a"termiticide bait".

10 Simple Techniques For Termite Control For Wood


For the bait system to work, the proper number of stations must find here be installed and the stations must be inspected or monitored regularly as indicated on the product label. When termites stop feeding, the lure is replaced with untreated wood or other cellulose material. As a variation of this strategy, apparatus may be pre-baited and placed in the soil in areas where termites are present. .

The second bait strategy currently in try this site use involves the attachment of lure apparatus directly to the face of construction elements where termites are feeding. These apparatus are pre-baited and are connected to the foundation walls, floor joists, sub floor and other similar locations. Termites then feed on the bait material.

There are advantages and disadvantages to the use of termiticide baits. Baits could be used to treat structures that cannot be treated with liquid termiticides due to the presence of a well, inaccessibility of infested areas or concerns about using pesticides. But, in the majority of circumstances baits do not provide rapid control of the termite infestation.

Bear in mind the best method for the control of subterranean termites is prevention. Listed below are a few options which should be used in termite control. Preventive measures should include:

Indicators on Termite Control Free Inspection You Need To


Removal of stumps, wood, roots, and other cellulose materials from the building site before construction is begun

There should be no contact between the building woodwork and the dirt or fill material. Exterior woodwork Ought to Be located a minimum of 6 inches above ground and beams in crawl spaces at least 18 inches above ground to provide ample space to create future inspections

Ventilation openings in foundations must be designed to prevent dead air pockets. This helps to keep the ground dry and unfavorable for termites

Thorough annual inspections should be conducted to discover evidence of activity like shelter tubes on foundation surfaces wings or adult termites

The Single Strategy To Use For Termite Control Free Inspection


Any wood that contacts the soil, such as fence posts and foundation elements should be Made from pressure treated wood

Appropriate grading to guide water away form the structureFor additional information or assistance regarding termites and termite control Procedures, please contact us.

Leave a Reply

Your email address will not be published. Required fields are marked *